Table of Contents

Appendix F 6 Design Binder Application Rate (Bd)

The design binder application rate, Bd, is determined by Equation 8:

   Bd = Bbm + allowances (L/m2)8
where    
 Bbm=modified basic binder application rate (rounded to the nearest 0.01 L/m2) 
 Allowances=any applicable allowances as per Section 6.2.2