Temporary traffic management

Cover of Guide to Temporary Traffic Management Part 1: Introduction
Guide to Temporary Traffic Management Part 1: Introduction
  • Publication no: AGTTM01-19
  • ISBN: 978-1-925854-57-2
  • Published: 10 December 2019
  • Edition: 1.0

Guide to Temporary Traffic Management  Part 1: Introduction provides an introduction to the topic of Temporary Traffic Management  and describes the structure to the 10 Parts of the Guide, the key principles of Temporary Traffic Management and the ongoing governance of the Guide and training by Austroads.

Watch the video below for an overview of Part 1.

  • 1. Scope of the Guide to Temporary Traffic Management
    • 1.1 Status
    • 1.2 Background to this 1st Edition of AGTTM
    • 1.3 Safety at Road Worksites Project Framework
    • 1.4 Purpose
    • 1.5 Application
  • 2. Structure and Use of AGTTM
    • 2.1 Structure of AGTTM
    • 2.2 Who Should Read Each Part of AGTTM?
  • 3. Definitions / Glossary of Terms
  • 4. Purpose of TTM
  • 5. Philosophy and Principles
    • 5.1 Philosophy
    • 5.2 Principles
      • 5.2.1 Uniformity
      • 5.2.2 Fit for purpose
      • 5.2.3 Design principles for traffic management devices
      • 5.2.4 The Safe System
      • 5.2.5 Designing for the driver
      • 5.2.6 Working in accordance with an approved TMP and TGS
      • 5.2.7 Road categories and training
  • 6. Governance
    • 6.1 General
    • 6.2 Guide consultation
  • References
  • Appendix A AGTTM Feedback Forms
    • A.1 Introduction
    • A.2 Submission Process
    • A.3 Feedback on Submissions
    • A.4 Minor Editorial and Minor Technical Correction Form
    • A.5 Significant Change Form