Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Home
Drivers and Vehicles
Toggle
Drivers and Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Future Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Safety and Design
Toggle
Safety and Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Network and Freight
Toggle
Network and Freight
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Freight
Active Travel
Assets
Toggle
Assets
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
Environment
National Prequalification
Pavements
Project Delivery
Road Tunnels
Publications
About Austroads
Latest News
Webinars and Events
Projects
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset management
Bridges
Economics and financing
Freight
Materials
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
288
Guides
7
Research Reports
13
Technical Reports
12
Topic
Topic
Aggregates
334
Annual reports
331
Asphalt
404
Automated vehicle safety
334
Bicycles
354
Binders
373
Binders test methods
344
Bitumen
376
Bituminous mixes test methods
340
Bridge construction
Bridge assessment
363
Bridge barriers
325
Bridge components
332
Bridge construction
320
Bridge design
Bridge maintenance
353
Bridge management
Bridge materials
375
Bridge performance
Capability assessment
327
Climate change
325
Community attitudes
330
Concrete
369
Congestion
332
Contracts
330
Cooperative ITS
347
Crash analysis
373
Data management
368
Design principles and process
339
Digital engineering (BIM)
321
Drainage
326
Driver licensing
345
Drugs and alcohol
330
Economic evaluation
366
Equipment test methods
345
Fibre reinforced polymer
324
Financing
338
Freight modelling
332
Freight policy
337
Geometric design
341
Granular materials
343
Heavy vehicle access
359
Heavy vehicle safety
359
Heavy vehicle weighing
327
Incident management
328
Indigenous communities
328
Intelligent transport systems
353
Intersection design
337
Land use
330
Level of service
339
Materials testing
445
Network management
352
Network operations
334
Network performance
332
Noise
327
Older drivers
331
Other assets management
339
Parking
327
Pavement construction
349
Pavement design
460
Pavement investigation test methods
340
Pavement maintenance
339
Pavement management
409
Pavement performance
544
Pedestrians
337
Performance based standards
330
Process and documentation
333
Procurement
329
Project governance
325
Project planning
326
Public transport
335
Rail bridges
325
Recycled material
328
Risk assessment
327
Road pricing
329
Roadside design
333
Rural and remote
349
Safe people
353
Safe roads
393
Safe strategy
327
Safe System
350
Safe vehicles
346
Safety audit
332
Safety strategy
343
Seals
397
Speed management
354
Stabilised materials
327
Steel
339
Strategic asset management
360
Structures management
327
Timber
325
Traffic controls
340
Traffic management
354
Traffic modelling
331
Traffic operations
326
Transport planning
334
Tunnel design
328
Tunnel operations
326
Tunnel safety
328
Vehicle registration
327
Waterway design
321
Year
Year
2018
7
2017
100
2016
3
2015
1
2014
74
2013
2
2012
4
2011
118
2004
3
2003
2
2002
2
2001
1
2000
2
1998
1
Publication State
Publication State
Archived
8
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 11 - 20 of 320 Publications
Bridge construction
Remove Bridge construction filter
Bridge design
Remove Bridge design filter
Bridge management
Remove Bridge management filter
Bridge performance
Remove Bridge performance filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Strengthening of Bridges for Higher Productivity Freight Vehicles
ABC2017-125-17
26 Apr 2017
Bridges
More
Currently there is pressure from the freight industry to allow higher performance freight vehicles (HPFV) the use of major transport routes, particularly between the major centres of Brisbane, Melbourne and Sydney. An initial review of the existing…
Strengthening and Widening of the Maribyrnong River Bridges
ABC2017-140-17
26 Apr 2017
Bridges
More
The Maribyrnong River Bridges (also known as E.J. Whitten Bridge), is Victoria’s second largest road bridge being a 520 m long ten span structure that carries the M80 Ring Road over the Maribyrnong River in the outer western suburbs of Melbourne.…
Design and Construction of Rail Grade Separations for an Accelerated Construction Program
ABC2017-148-17
26 Apr 2017
Bridges
More
The Level Crossing Removal Project Package 1 (LCRP1) has successfully achieved its goal in Connecting Communities through the removal of four level crossings in record time by lowering the rail under road. The simultaneous removal of three of these…
Bridge Design Challenges on the Waikato Expressway Huntly Section, New Zealand
ABC2017-136-17
26 Apr 2017
Bridges
More
The Huntly Section is a new NZ$415M section of the Waikato Expressway running between Hamilton and Auckland. It will connect the recently completed Ngaruawahia and Ohinewai sections on a route that traverses the Taupiri Ranges within a deep cutting…
A Rail Bridge in Twenty Days: The Torrens To Torrens North:South Corridor Upgrade
ABC2017-149-17
26 Apr 2017
Bridges
More
The Torrens Road to Torrens River (T2T) project forms part of the overall North-South Road Corridor upgrade in Adelaide, South Australia and incorporates many components such as a new lowered motorway, road, service and pedestrian bridges, retaining…
Shared Path Bridges over Warringah Road Frenchs Forest, Sydney, Australia
ABC2017-159-17
26 Apr 2017
Bridges
More
As part of the Northern Beaches Hospital Connectivity and Network Enhancement Project, Warringah Road is being upgraded and widened to accommodate grade separation. The upgrade includes two new shared path bridges, at Forest Way and Hilmer Street,…
Replacement Of Four Long Bridges In Fiji Islands
ABC2017-111-17
26 Apr 2017
Bridges
More
Four bridges in the Fiji Islands were recently replaced using a Design and Construction procurement method for the Fiji Road Authority. The bridges provided vehicle, pedestrian and Fiji Sugar Corporation cane trains over waterways subjected to…
Kookaburra Viaduct: First-World Infrastructure for a Developing Nation
ABC2017-104-17
26 Apr 2017
Bridges
More
The Kookaburra Viaduct connects Jacksons International Airport and the Waigani district, where the Papua New Guinea government offices are located, in Port Moresby. The purpose of the project was to provide an efficient and uninterrupted connection…
Criteria and Guidance for the Design of Integral Bridges
ABC2017-103-17
26 Apr 2017
Bridges
More
Integral and semi-integral bridges are a common form of construction, providing some marked advantages over other construction forms. Integral and semi-integral bridges minimise the use of bearings and expansion joints by providing a direct…
Epping To Thornleigh Third Tracking (Ettt) Project - M2 Bridge Alternative Design, Sydney
ABC2017-154-17
26 Apr 2017
Bridges
More
The existing rail lines at this location sit on a marginally stable embankment of 1.5:1 slope and height varying between 6m to 15m. The existing lines cross the M2 motorway via an under-bridge and Devlin’s creek via an old masonry arch culvert.
Prev
1
2
3
4
5
Next
Latest news
26 Nov 2019
Accurately modelling heavy vehicles in traffic
15 Nov 2019
Find out more about Austroads’ scope, work and people
13 Nov 2019
Austroads Annual Report celebrates 30 years
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No