Publications

Filter
Topic
Publication State
Showing 1 - 10 of 320 Publications
Guide to Bridge Technology Part 1: Introduction and Bridge Performance
Guide to Bridge Technology Part 1 provides general information about bridge design and construction. Topics covered in this Part include factors affecting bridge performance, their relationship to bridge design standards, and the evolution of…
Guide to Bridge Technology Part 5: Structural Drafting
Guide to Bridge Technology Part 5 sets out the principles involved in the presentation of bridge structural drawings and is intended to give engineers and draft persons at all levels a sound guide in drafting presentation and information. The Guide…
Guide to Bridge Technology Part 4: Design Procurement and Concept Design
Guide to Bridge Technology Part 4 provides guidance about effectively specifying and scoping contractual requirements for bridge design parameters, particularly for design/construct and similar contracts for bridge procurement. This guidance is…
Guide to Bridge Technology Part 7: Maintenance and Management of Existing Bridges
Guide to Bridge Technology Part 7 discusses the structural management of existing bridges in practical technical terms. It documents practices relevant to forward works programming, inspection, recording, reporting, evaluation of bridge condition…
Guide to Bridge Technology Part 2: Materials
Guide to Bridge Technology Part 2 covers all aspects of the common building materials available to the engineer including concrete, masonry, metallic and non-metallic materials and timber. This Part discusses material characteristics, their…
Guide to Bridge Technology Part 6: Bridge Construction
To ensure that bridges are properly constructed in accordance with the design drawings and specifications, engineers need to be well-informed on all aspects of their design and construction, including awareness of the problems that may arise and the…
Guide to Bridge Technology Part 3: Typical Superstructures, Substructures and Components
Guide to Bridge Technology Part 3 discusses the need for the bridge designer to address the specific requirements such as the transporting of goods and services, development of flood free routes, navigational clearances, longer spans, and…
Accelerated Evaluation of the Effectiveness of Supplementary Cementitious Materials to Suppress Damaging AAR Expansion in Concrete Structures

This report provides the results of testing of three potentially reactive aggregates by the accelerated mortar bar test (AMBT) and the concrete prism test (CPT).

The tests were conducted using reference mixes, which contained plain Portland cement as…

VicRoads Project Integration With The Level Crossing Removal Authority (LXRA) Structures
Over the next eight years the Level Crossing Removal Authority will oversee the removal of 50 dangerous and congested level crossings across Melbourne.
Citylink Tulla Widening Project English Street Bridge Demolition and Construction
As part of the CityLink Tulla Widening (CTW) project, the English Street Bridge will be reconstructed to accommodate the widened Tullamarine Freeway and improve access to Essendon Fields. The reconstructed English Street Bridge will be a single span…