Traffic Management

Cover of On-Road Public Transport Priority Tool
On-Road Public Transport Priority Tool
  • Publication no: AP-R645-20
  • ISBN: 978-1-922382-42-9
  • Published: 2 December 2020

This report presents a practical process (referred to as a ‘tool’) to guide practitioners through the selection of the appropriate On-Road Public Transport (ORPT) priority treatments for any road scenario.

This step-by-step process can be used for applications relating to existing roads or a new/greenfield road development.

It considers all forms of priority, ranging from road space, stop design and location, traffic signal priority, and traffic signal gating.

Using this guidance, practitioners will ensure consistency, traceability, and robustness of their decision-making process.

This webinar, presented by David Green and Graham McCabe, provides an overview of the tool explaining how it was developed and how practitioners may use the tool in their day-to-day work.

  • 1. Introduction
    • 1.1 Purpose
    • 1.2 Scope
    • 1.3 Methodology
  • 2. ORPT Tool – Existing Roads
    • 2.1 Stage 1: Background and Foundation Setting
    • 2.2 Stage 2: Understanding the What, Why and Who – Existing Roads
    • 2.3 Stage 3: Consider ORPT Priority Treatments to Adopt for the Link – Existing Roads
  • 3. ORPT Tool – Greenfield Roads
    • 3.1 Stage 1: Background and Foundation Setting
    • 3.2 Stage 2: Consider ORPT Priority Treatments to Adopt for the Link
  • 4. Conclusion
  • References
  • Appendix A LOS Framework as Outlined in Commentary 2 of GTM Part 4
  • Appendix B Movement and Place Framework
  • Appendix C Known ORPT Priority Treatments
    • C.1 ORPT Category
    • C.2 ORPT Priority Treatments by Category
    • C.3 Example Images of ORPT Priority Treatments
  • Appendix D Case Studies
    • D.1 Auckland: Manukau Road T3 Lane Corridor
      • D.1.1 The Problem
      • D.1.2 Project Description
      • D.1.3 Project Outcomes
    • D.2 Adelaide: Currie and Grenfell Streets and East Terrace Bus Lanes
      • D.2.1 The Problem
      • D.2.2 Project Description
      • D.2.3 Project Outcomes
    • D.3 Perth: Beaufort Street Peak Bus Lanes
      • D.3.1 The Problem
      • D.3.2 Project Description
      • D.3.3 Project Outcomes
    • D.4 Sydney: Liverpool to Parramatta T-Way
      • D.4.1 The Problem
      • D.4.2 Project Description
      • D.4.3 Project Outcomes
    • D.5 Melbourne: Victoria Parade Bus Lane Project
    • D.5.1 The Problem
    • D.5.2 Project Description
      • D.5.3 Project Outcomes
    • D.6 Melbourne: Smith Street Part-time Tram Lane Improvements Trial
      • D.6.1 The Problem
      • D.6.2 Project Description
      • D.6.3 Project Outcomes
    • D.7 Melbourne: Active Traffic Signal Bus Priority
      • D.7.1 The Problem
      • D.7.2 Project Description
      • D.7.3 Project Outcomes
    • D.8 Gold Coast: G: Link LRT, Stage 1
      • D.8.1 The Problem
      • D.8.2 Project Description
      • D.8.3 Project Outcomes
  • Appendix E ORPT Analysis
    • E.1 Traffic Congestion
    • E.2 Bus/LRT Congestion
    • E.3 Stop Frequency