Test Methods and Specifications
Supply of Geopolymer Concrete
- Publication no: ATS-5330-20
- Published: 20 January 2020
- Edition: 1.0
- PDF (free) Download
Austroads Technical Specification 5330 covers the requirements for the supply and delivery of Geopolymer Concrete in strength grades up to 50 MPa for use in the following applications:
- gutters, kerbing, drainage channels, footpaths, driveways, shared paths, post footings and safety barrier anchor blocks
- minor cast-in-place works or the production of precast elements with a design life not exceeding 50 years, such as stormwater pits and headwalls.
The technical specification can also be downloaded as a Word document.
- 1. Scope
- 2. Definitions
- 3. Referenced Documents
- 4. Quality System Requirements
- 5. Manufacturer Competency
- 6. Manufacture of Geopolymer Concrete
- General
- Water
- Addition of Water at the Slump Stand
- 7. Delivery of Geopolymer Concrete
- General
- Delivery Docket
- Period for Completion of Discharge
- Water Left in the Mixer or Agitator
- 8. Geopolymer Concrete Properties
- 9. Additional Requirements for Placement of Geopolymer Concrete
- Annexure A: Summary of Hold Points, Witness Points and Records