This report presents the summary of project activities conducted in 2005/06. A number of suitable sealed granular pavement sites were identified across Australia for inclusion in the LTPP study. Interim WE models were developed. An improved revised method was used to calibrate HDM-4 RD models for roughness, rutting and cracking to suit Victorian, South Australian and Tasmanian local conditions. An attempt will be made to employ the revised method for the data from other Austroads Member Authorities' (SRAs) road network.

  • AT-T81/07 Austroads LTPP and LTPPM Study: Summary Report for 2005/06
  • SUMMARY
  • TABLES
  • 1. INTRODUCTION
    • 1.1. Background
    • 1.2. Study objectives and scope of this report
    • 1.3. Report structure
  • 2. BACKGROUND OF THE LTPP STUDY
    • 2.1. US (SHRP) LTPP program
    • 2.2. Australian LTPP and LTPPM program
  • 3. DATA COLLECTION
    • 3.1. General
    • 3.2. ARRB walking profiler
    • 3.3. Multi-laser profiler (MLP)
    • 3.4. Falling weight deflectometer
    • 3.5. Visual inspection procedure
    • 3.6. Additional data collected
  • 4. SUMMARY OF ACTIVITIES 2005/06
    • 4.1. Background and scope of work for 2005/06
    • 4.2. Monitoring the condition of LTPP and LTPPM sites
    • 4.3. Signs for LTPP and LTPPM sites
    • 4.4. Selection of additional sites
    • 4.5. Development of road deterioration (RD) models
    • 4.6. Development of works effects (WE) models
    • 4.7. Technology transfer activities
  • 5. SUMMARY OF DATA COLLECTION AND OVERALLTRENDS
    • 5.1. LTPPM study
    • 5.2. LTPP study
    • 5.3. Dipping tests at the LTPPM sites
  • 6. BENEFITS OF LTPP STUDIES TO DATE
    • 6.1. Comparative analysis
    • 6.2. RD and WE models
    • 6.3. Support to AAPA heavy duty pavement project
    • 6.4. Austroads member authority (AMA) LTPP sites
    • 6.5. Other benefits
  • 7. PROPOSED WORK PLAN FOR 2006/07
    • 7.1. Task 1: Completion of the development of RD models
    • 7.2. Task 2: Monitor the condition of selected LTPP and LTPPM sites
    • 7.3. Task 3: Technology transfer activities
    • 7.4. Task 4: Summary of activities
  • 8. CONCLUSION AND RECOMMENDATION
    • 8.1. Conclusions
    • 8.2. Recommendations
  • REFERENCES
  • APPENDIX A SURFACE CONDITION AND PERFORMANCETRENDS AT THE LTPPM SITES
  • APPENDIX B SURFACE CONDITION ANDPERFORMANCE TRENDS AT LTPP SITES
  • APPENDIX C DIPPING TEST RESULTS
  • INFORMATION RETRIEVAL