Austroads and the Australian Asphalt Pavement Association (AAPA) have jointly prepared this Guide to the Audit and Surveillance of Sprayed Sealing Contract Works as an aid to promoting good practice in the performance of sprayed sealing work. Successful sprayed sealing work requires attention to a large amount of detail in the selection, design and carrying out of sprayed sealing operations. With the introduction of quality assured contracts, sprayed sealing specifications used by most road agencies have evolved from being largely method-based to being mostly expressed in terms of outcomes. Detailed procedures for achieving those outcomes are therefore the responsibility of the Contractor and documented in the Contractor s Quality System and Project Quality Plan. The intention of this guide is to provide a systematic framework for evaluating the adequacy of that documentation as well as its application. This guide is intended to be used in conjunction with relevant specifications and guides to good practice.
  • AP-T40/05 Audit and Surveillance of Sprayed Sealing Contract Works
  • EXECUTIVE SUMMARY
  • TABLE OF CONTENTS
  • 1. PURPOSE AND SCOPE
    • 1.1. Purpose
    • 1.2. Scope
    • 1.3. Definitions
  • 2. QUALITY PLANS
  • 3. CHARACTERISTICS OF SPRAYED SEAL WORK
  • 4. APPLICATION OF THE QUALITY AUDIT PROCESS
  • 5. QUALITY AUDIT PROCEDURE
    • 5.1. Scope of Quality Audit
    • 5.2. Preparation for Audit
    • 5.3. Audit Checklist
  • 6. CHECKLISTS
    • 6.1. Project Quality Plan Documentation
    • 6.2. Design, Materials and Field Procedures
    • 6.3. Performance Contracts
  • REFERENCES
  • INFORMATION RETRIEVAL