Pavement

Cover of Austroads LTPP/LTPPM Study - Summary Report 2016–17
Austroads LTPP/LTPPM Study - Summary Report 2016–17
  • Publication no: AP-T332-18
  • ISBN: 978-1-925671-29-2
  • Published: 14 March 2018

This report provides a summary of works undertaken during the period 2016–17 for the Austroads project AT1064 – Long-term pavement performance (LTPP).

Austroads has funded the long-term pavement performance study since late 1994. The project monitors the structural and functional performance of in-service pavement test sites across Australia.

The report also presents a summary of the LTPP/LTPPM current conditions and historical performance trends over the entire monitoring period and a brief summary of results of a survey on future directions of the project.

The LTPP data is available on ltpp.info

  • Summary
  • 1. Introduction
    • 1.1. Background
  • 2. Scope of Work for 2016–17
  • 3. Summary of Activities Undertaken in 2016–17
    • 3.1. Project Steering Group (PSG) Meeting
    • 3.2. LTPP and LTPPM Sites
      • 3.2.1. Monitoring
      • 3.2.2. Performance Trends
      • 3.2.3. Site Maintenance
    • 3.3. Future Directions Paper
    • 3.4. Project Dissemination and Technology Transfer
  • 4. Work Plan for 2017–18
  • 5. Project Outcomes for 2016–17
  • References
  • Appendix A Performance Trends – LTPP Sites
  • Appendix B Performance Trends – LTPPM Sites