This report extends on the work previously conducted by Austroads in investigating the development and implementation of a national automated bridge assessment framework. The work outlines the ongoing validation works and recommends a set of activities to assist in the deployment of the framework.

Additionally, a roadmap to implementation has been prepared to highlight key areas which must be addressed to ensure the framework can be deployed.

  • Summary
  • 1. Introduction
    • 1.1. Background
    • 1.2. Purpose
    • 1.3. Scope
    • 1.4. Glossary/Key Terms
  • 2. Framework Primer
    • 2.1. National Structures Network
    • 2.2. Summary of Existing Access Framework
      • 2.2.1. Access Levels
      • 2.2.2. Vehicle Development and Approval
      • 2.2.3. Definitions of Bridge Assessment Tiers
      • 2.2.4. Bridge Assessment Techniques
    • 2.3. Proposed Framework
      • 2.3.1. Framework Aims
      • 2.3.2. Framework Scope
      • 2.3.3. Framework Methodology
      • 2.3.4. Example of Preparing a Structure for the Framework
      • 2.3.5. Validation of Framework
      • 2.3.6. Caveats
      • 2.3.7. Value Adds
  • 3. Roadmap to Implementation
    • 3.1. Framework Support
    • 3.2. Framework Administration
    • 3.3. Detailed Description of the Proposed Framework Operational Workflow
      • 3.3.1. Framework Pre-population
      • 3.3.2. Application Processing
      • 3.3.3. Ongoing Management
    • 3.4. Simulation Trial
    • 3.5. Further Validation Work
    • 3.6. Guideline for Local Asset Owners
    • 3.7. Future Implementation Funding
    • 3.8. Implementation challenges
      • 3.8.1. Funding Entity
      • 3.8.2. Requirement to Participate
      • 3.8.3. Authority to Develop and Administer
      • 3.8.4. Direct Costs to Bridge Asset Owners
      • 3.8.5. Transition Process from Current Axle Spacing Mass Schedules/Bridge Formula to the Framework
  • 4. Conclusions
  • References
  • Appendix A Validation Works
  • A.1 Introduction
  • A.2 Summary of TP1681 Validation
  • A.3 Summary of TP1951 Validation
  • A.3.1 Modified M1600 Reference Vehicle Validation
  • A.3.2 Modified M1600 Reference Vehicle Skew Analysis
  • Appendix B Jurisdiction Trials
  • B.1 Stage 1 Activity Summary
  • B.2 Stage 2 Activity Summary
  • B.3 MRWA Stage 1 & 2 Activities
  • B.4 DPTI Stage 1 & 2 Activities
  • B.5 Roads and Maritime Stage 1 & 2 Activities
  • B.6 TMR Stage 1 & 2 Activities
  • B.7 VicRoads Stage 1 & 2 Activities
  • B.8 Analysis
  • B.8.1 Review of Results for Structure Variables
  • B.8.2 In-depth Review of Selected Jurisdictional Results